Power Plant units are responsible for providing power generation in the power system so that the load can be served.Poer Plant units may trouble each time. The disorder resulting plants cannot operate. If this interference occurs at the same time on several large generating units, it is possible that the power available in the system is reduced such that the system is not sufficient to serve the load. Reliability cf the electrical system must be maintained and enhanced, so that the load needs to be served. Thus it is necessary to investigate whether or not the reliability of the system every year. Reliability of the electrical system can be determined by calculating the value of (loss of load probability) LOLP with units of days / year. The smaller the value, the better the level of LOLP
kendalan an electrical system. In 2009 the electrical system of Central Java and Yogyakarta not meet the standards, ie the value of LOLP 4.088 days / year. For the years 2010 and 2011 has increased reliability and meet the standards, with the value of 0.043 days in 2010 and 0.017 in 2011 days.
Keywords: LOLP, reliability of Electric Power Systems

Full Text:

PDF

Article Metrics

Abstract view : 564 times
PDF - 468 times

DOI: https://doi.org/10.26714/me.v5i1.645

Refbacks

  • There are currently no refbacks.




Copyright (c)



Editorial Office of Media Elektrika


Universitas Muhammadiyah Semarang FT-FMIPA Building, 7nd Floor. 
Department of Electrical Engineering
Jl. Kedungmundu Raya No. 18, Kota Semarang, Prov. Jawa Tengah, Indonesia 50273

Phone: 085299398663
Email: [email protected]

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.