OPTIMALISASI REKONFIGURASI PEMBANGKIT LISTRIK TENAGA GAS DAN UAP TAMBAK LOROK SEMARANG

Agus Adhi Nugroho(1*), Muhammad Haddin(2), Muhammad Alief Rizky Kurniawan(3)


(1) 
(2) 
(3) 
(*) Corresponding Author

Abstract


The Reliability and the quality of electric energy is not enough to make a consideration in deciding which power plant is choose in the utility business. Some of the power plant operated in Central Java still using power plant that has expensive generating cost, especially  steam and gas power plant (PLTGU). In order to make economically viable, there must be calculation on generating cost and make some optimization through reconfiguration of power plant using Digsilent simulator. Filled with conductors  capacity, power plant capacity, and the load, Digsilent will calculate the load simulation. When PLTGU block 2 not operated, so IBT 500/150 kV  Ungaran  1  and  2  suffer  overload for 103%, causing voltage drop to 134 kV. After some reconfiguration simulation, the load in IBT 500/150 kV Ungaran 1 and 2 drop to 76%, while the voltage maintain to 140 kV. Decreasing the production cost as much as Rp.107.600.400.000,- in a month.

Keywords: PLTGU, Optimization, Digsilent, production cost

Full Text:

PDF

Article Metrics

Abstract view : 537 times
PDF - 190 times

Refbacks

  • There are currently no refbacks.


UNIMUS | Universitas Muhammadiyah Semarang
Jl. Kedungmundu Raya No. 18 Semarang

email:[email protected]  http://unimus.ac.id